With the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure..

Spoken by Rakosan

talk_item:剧情_3_0_一级POI_天文台主线任务_6_4:1:7

Raw API
01

Where this line appears

With the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure.
Flow state 剧情_3_0_一级POI_天文台主线任务_6_4Authored order ShowTalk · line 7Source BinData/flowState/flowstate.json · row 10978

Quest references

No confirmed quest link is available for this line in the imported data. Nearby dialogue is shown below.

Nearby authored lines

Rover

You're leading the project now. That's pretty impressive too.

Open line
Rakosan

Thanks for the compliment! But honestly... I just landed this job by chance.

Open line
Rakosan

We've reached the Overwatch Phase. We're going to build the Observatory's main structure right on top of the Suspension Platform!

Open line
Rakosan

With the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure.

Rakosan

Let's finish this together, Rover!

Open line
Rakosan

She did. The Exoswarm she brought are just as strong as our robots, and twice as adept.

Open line
Rakosan

Sephira also apologized to me. I get it, she was just worried sick about Dhalifa. Water under the bridge! Besides, she's making up for it by putting in the hard work now!

Open line
Authored order is preserved; this excerpt does not claim a specific runtime branch traversal.
Source graph connections2 technical references
talk_item:剧情_3_0_一级POI_天文台主线任务_6_4:1:7 — Node Explorer | Solaris Atlas