You're leading the project now. That's pretty impressive too.
Open lineWith the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure..
Spoken by Rakosantalk_item:剧情_3_0_一级POI_天文台主线任务_6_4:1:7
Where this line appears
With the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure.
Quest references
No confirmed quest link is available for this line in the imported data. Nearby dialogue is shown below.
Nearby authored lines
Thanks for the compliment! But honestly... I just landed this job by chance.
Open lineWe've reached the Overwatch Phase. We're going to build the Observatory's main structure right on top of the Suspension Platform!
Open lineWith the baseplates already fully expanded and the Suspension Platform ready, all that's left is to integrate the Signal Panels and the Projection Ring into the main structure.
Let's finish this together, Rover!
Open lineShe did. The Exoswarm she brought are just as strong as our robots, and twice as adept.
Open lineSephira also apologized to me. I get it, she was just worried sick about Dhalifa. Water under the bridge! Besides, she's making up for it by putting in the hard work now!
Open line